The Environmental Study Report (ESR) is available at the following locations during regular business hours for a period of 30 calendar days for review and comment, starting on June 2, 2016.
The United Counties of Prescott-Russell
59 Court St., L’Orignal
Ottawa City Hall Client Service Centre
110 Laurier Ave. W., Ottawa
Carleton University (digital only)
MacOdrum Library
1125 Colonel By Dr., Ottawa
Orléans Library
1705 Orléans Blvd., Orléans
Clarence-Rockland Town Hall
1560 Laurier St., Rockland
Orléans Client Service Centre
255 Centrum Blvd., Orléans
Ottawa University (digital only)
Morisset Hall
65 University Pvt., Ottawa
North Gloucester Library
2036 Ogilvie Rd., Gloucester
Ministry of Environment and Climate Change
103-2430 Don Reid Dr., Ottawa
Clarence-Rockland Library
1525 Du Parc Ave., Clarence-Rockland
Cumberland Museum
2490 Old Montreal Rd., Cumberland
Main Public Library
120 Metcalfe St., Ottawa
Cumberland Library
1599 Tenth Line Rd., Orléans
For further information, or if you have accessibility requirements in order to participate in this project, please contact one of the following people.
Marc R. Clermont, P. Eng.
Director of Public Works
United Counties of Prescott and Russell
59 Court St., P.O. Box 304
L’Orignal, Ontario K0B 1K0
Phone: 613-675-4661 ext. 3100
E-mail: MClermont@prescott-russell.on.ca
Angela Taylor, P Eng.
Senior Project Engineer
Transportation Planning Branch
Planning & Growth Management
City of Ottawa
110 Laurier Ave. West
Ottawa, Ontario K1P 1J1
Phone: 613-580-2424 ext. 15210
E-mail: Angela.Taylor@ottawa.ca
Valerie McGirr, P. Eng.
Consultant Project Manager
AECOM
302-1150 Morrison Dr.
Ottawa, Ontario K2H 8S9
Phone: 613-820-8282 ext. 243
E-mail: Valerie.McGirr@aecom.com
Download Available Here:
Please select the file or files you wish to download and save them to your computer.
Summary – English: 1MB
Résumé – French: 1MB
Environmental Study Report: 52MB
Recommended Plan Drawings – OR 174 from Highway 417 to Trim Road: 25MB
Recommended Plan Drawings – OR 174 from Trim Road to City of Ottawa Boundary: 16MB
Recommended Plan Drawings – CR 17 from Prescott and Russell Boundary to Landry Road: 12MB
Appendices:
- A – Consultation: 60MB
- B – Project Need Report: 1MB
- C – Stage 1 Archaeological Assessment: 84MB
- D – Views and Vistas Photo Inventory: 2MB
- E – List of Businesses, 2012 and 2015: 260KB
- F – Natural Environment Report: 65MB
- G – Geotechnical Inventory Report: 11MB
- H – Environmental Site Assessment: 245MB
- I – Fluvial Geomorphology Report: 9MB
- J – Evaluation Report, East Light Rail Transit (Blair Station to Trim Road) integrated with Highway 174 Widening (Highway 417 to Trim Road): 11MB
- K – Refinement of the Preferred Design for the East LRT Following Round 3 Consultation (from the Environmental Project Report for the East LRT): 1MB
- L – Evaluation Report Ottawa Road 174 / Prescott and Russell County Road 17: 10MB
- M – Noise and Vibration Report: 66MB